September 14, 2015

Six-Mile Greenway Loop would rebuild West Baltimore

Unify the communities by unifying their geography -

Southeast Baltimore has the waterfront... West Baltimore needs a comparable large, defining public space - a place that tells you where you are and makes you glad you're there. A place that confirms that West Baltimore is special and purposeful and tied together. It just so happens that a six-mile greenway loop is available to fill the bill - an ideal shape for such a space - for pedestrians, bikes, joggers, transit and a magnet for new development.
Martin Luther King Blvd. frontage has the right idea here: A greenway oriented to housing.
It just needs to be expanded into a real linear park.

But unfortunately, the latest Southwest Plan looks inward where it should look outward. It turns its back to the very spaces that should define it. The area of West Baltimore to the north, including Harlem Park and Sandtown, is just beginning an agonizing reappraisal in light of the recent unrest. It urgently needs a strong linkage toward the city beyond.

This six-mile loop would serve both the northwest and southwest. It would have it all in spectacular contrast - academia, funk, history, organized nature, wild nature, golf, Baltimore's two largest office buildings, other commercial sites and a postmodern urban world apart.

West Baltimore already has the raw material: Huge historic Carroll Park, attached to a golf course, both of which are now isolated from all the nearby neighborhoods to the north. It has a major downtown college campus - the University of Maryland - which is far less of a campus than it could be. It has the very natural and very historic Gwynns Falls Greenway, which again is very isolated.

West Baltimore also has two great rail transit corridors - one of which happens to be the oldest rail corridor in America at nearly 200 years old (The B&O Railroad). The other is so new that it hasn't even been developed yet, despite 50 years of trying (the "Highway to Nowhere").

Nearest to the northwest is Heritage Crossing, the beautiful neo-Olmstedian neighborhood built in the 1990s as a catalyst to rebuild its surroundings, at which it has failed, including the fine but crumbing Victorian architecture of Lafayette Square.

The problem here is that we have allowed borders to divide instead of unite us. But borders are actually the best place to put a defining space, because they can take advantage of unique geography while minimizing conflicts, while bringing both sides together. Making these spaces the focal point for development is essential. Borders cannot succeed in a vacuum.

Most of this six-mile loop is already in the city's bike plan and various park plans. It simply has not been thought out together in the context of the whole city.

Let's make this work, folks! West Baltimore has too much going for it to fail.


The West Baltimore Six-Mile Loop

Here's the greenway loop, in six color-keyed segments, starting to the east (right) at the downtown end and going clockwise:

Six-mile West Baltimore Greenway with six color-keyed segments

1 - Martin Luther King Boulevard - Purple - This major downtown bypass built in the early 1980s was originally supposed to be an expressway, and so it had many odd leftover parcels that are already lush and attractive (see top photo) but never really related to much. The boulevard can easily be shrunk by narrowing the median and eliminating some of the right turn lane space without adversely affecting traffic flow.

This leftover space can be consolidated on the west side to create a great linear park oriented to adjacent development parcels. This can also serve as a great campus space for the University of Maryland, which has been striving to link its downtown campus westward across MLK Boulevard to its biotech park.

Read more about this in a 2014 article in the BaltimoreBrew.

2 - Pigtown Gateway - Orange - Between Pratt Street and Washington Boulevard, the loop would turn westward into the community to the B&O Railroad Museum. Besides those two streets, which carry more traffic, Ramsay and McHenry Streets in between would also be candidates for the loop, as would any two, three or all four.

Pigtown's recent plan identifies this area as a business district gateway to lure new customers from downtown and MLK Boulevard through traffic. This portion of the loop has the particular advantage of being the most affluent, including Barre Circle and Camden Crossing, which establishes the desired more upscale image to set the tone for business.

This type of association has often been the key to upgrading city neighborhood business districts, notably in Hampden, Federal Hill, Canton, Lauraville, Charles Village and Mount Vernon, while retaining their "funky" characters.

Large planters have been put in the middle of Ramsay Street to prevent through traffic, which is ideal for bikes and pedestrians.

3 - B&O Railroad "First Mile" - Royal Blue - The B&O Railroad Museum, terminus of the first mile of American railroading, is a truly world-class institution and historic treasure. Unfortunately, the track area has been allowed to become a dangerous urban "no man's land", officially off-limits but still an extremely important space at the north edge of lovely large Carroll Park overseen by the city's oldest and most significant mansion.

These tracks have had several lifetimes, from the original narrow-gauge "Tom Thumb" to the city's first major passenger terminal to a major railroad maintenance yard and then a short tourist ride. Now this corridor must be redefined once again to serve the communities. Urban parks such as Carroll Park need urban edges to draw people in and create a viable constituency. (This plan was first presented in this February 2014 BaltimoreBrew story.)

Carroll Park North Edge - "First Mile" schematic concept by Marc Szarkowski

Here is the concept (illustrated above and below). Just north of Carroll Park (starting from the left), a parkfront address would be established for new urban development along a public street, which could be named "First Mile Avenue". Next to that would be the railroad tracks, suitable for museum trains and/or streetcars (possibly serving a new streetcar museum) and echoing the corridor's historic roots. The streetcar line could even be branched-off a downsized Red Line.

Next to that would be the bike/pedestrian greenway trail. Finally on the south edge of the corridor would be steps down to enter the north edge of Carroll Park.

View of the iconic B&O Museum roundhouse would provide a memorable focal point
 
for the east end of the "First Mile" corridor. (by Marc Szarkowski)

The west end of this corridor is anchored by the city's largest office building, Montgomery Park, as well as the Carroll Park Golf Course. The golf course is blocked by active CSX railroad tracks, which in 1907 the Olmsted Brothers recommended be linked with a short tunnel (before the golf course was built).

Proposed Carroll Park Clubhouse could link the golf course to the rest of the park and anchor the greenway, with an entryway under the active CSX railroad track. (Marc Szarkowski)

Such an Olmsted railroad underpass could be incorporated into a new golf clubhouse on the isolated park fragment north of Montgomery Park along Monroe Street, creating a memorable complimentary anchor to the B&O Roundhouse at the other end of the "First Mile" (illustrated above).

The golf course could be reoriented to this site and, for the first time, actually feel like a true urban golf course and an integral part of Carroll Park instead of just being a separate place off of the Interstate 95/Washington Boulevard 95 interchange. Imagine downtown workers catching a streetcar to play nine holes after a short day at the office.

Between the north edge of the golf course and the CSX tracks, the greenway would traverse one of the most beautiful, bucolic and obscure areas in all of Baltimore. Except for the litter, it's hard to believe the area in the photo below is practically right next to the Carrollton Ridge neighborhood.

Hidden area between Carroll Park Golf Course and Southwest communities with a lake and a mostly unused dead-end trail branch 

4- Gwynns Falls Trail - Green - Westward from the golf course, the loop would join the existing trail near its most memorable point where it goes under the Carrollton Viaduct, America's oldest railroad bridge (photo below). This beautiful trail continues up to Baltimore Street, at which point the existing path continues northwestward to Leakin Park, historic Dickeyville and into Baltimore County, while the new West Baltimore loop would veer off back to the northeast.

Carrollton Viaduct - America's oldest railroad  bridge - from the trail

5 - Amtrak Trail - Red - The greenway would then proceed from Baltimore Street near the Gwynns Falls along the Amtrak right of way and adjacent miscellaneous industrial parcels. Amtrak, the state and Federal Railroad Administrations are currently studying a billion-plus dollar upgrade to the Amtrak line. The study is focused primarily on replacing the tunnel toward Penn Station, but it could have a major impact on this area was well. The MARC station at Franklin/Mulberry is also in great need of replacement, and sites in this area could be selected because they are on straight track, which is a requirement for stations. This trail, which is included in the city's bike plan, could be built as an early phase in what could eventually be a huge project.

6 - Franklin/Mulberry "Highway to Nowhere" - Light Blue - The final segment of this clockwise loop six-mile tour is the only one not currently included in the city's bike plan, but its significance would far transcend that of just bikes. (Instead the city has proposed a small four-block bike/jogging loop along the top rim of the highway's walls and bridges east of Fulton Avenue, a project of very limited use.)

The largest issue is whether the "Highway to Nowhere" should be eliminated to enhance redevelopment, of which the greenway loop would be an integral part. Recently, the highway has been closed numerous times in one or both directions for various reasons, even simultaneously with the closure of the Frederick Avenue bridge, with no significant ill-effects. The city was also willing to reduce the peak through capacity of US 40 by 50-percent (3 to 2 lanes) to squeeze in the Red Line, which was acknowledged to cause far greater congestion and traffic diversion impacts.

Eliminating the "Highway to Nowhere" to create a new redevelopment corridor would have a far better impact than even building the $3 billion-plus Red Line (although they don't preclude each other at all). This would be a unique new urban geographic feature, free of traffic conflicts, with tremendous possibilities comparable (but not at all similar) to the potential which was unleashed when the portion of the proposed expressway system was cancelled along the southeast waterfront in the 1980s.

Proposed Harlem Park Red Line Station with elimination of the "Highway to Nowhere".
(MTA rendering modified by Marc Szarkowski)

The greenway loop would be the element which most orients the new development corridor to the energy of the rest of the city, especially downtown. In the rendering above, the greenway is the frontage along the lower level of the buildings along Mulberry Street (to the left), off limits to auto traffic. The buildings along the roadway to the right would accommodate larger-scale uses for which auto access is desirable along both the lower level (street shown) and upper level (Franklin Street).

This rendering was adapted from the MTA's depiction of the Harlem Park Red Line Station isolated in the highway median strip. Considering the Baltimore region's abysmal track record on "transit oriented development", this is a far more effective plan than the MTA and city's concept which retains the depressive highway. (See blog post.)


Full-Circle to Downtown

That brings us full-circle along the greenway loop to the interchange of the "Highway to Nowhere" and Martin Luther King Boulevard. This is where the Social Security Administration recently abandoned the city's second largest office building. (Yes, along with Montgomery Park, this greenway would serve both of the city's largest office buildings at its opposite ends.)

It is crucial to the future of the entire city that this massive office complex be redeveloped, and yet the current highway configuration (going directly underneath) makes this extremely difficult. Getting rid of the interstate highway remnant is the best course for creating a viable redevelopment site, and adding the greenway loop would make it even better.

Furthermore, this site is the best opportunity for all of west and southwest Baltimore to feed off the energy of downtown. While until now, MLK Boulevard and the "Highway to Nowhere" have divided these areas from downtown and each other, here is the opportunity to tear down the barriers and create real unity.


Special credit to Marc Szarkowski for the great graphics, and the intelligence behind them!

September 7, 2015

Red Line Obituary 1999-2015: So What Happens Next?


The decision of where a west transit line would be built, if anywhere, was made nearly a half century ago in 1967, when a 1.5 mile swath of West Baltimore was condemned and quickly destroyed for what is now the "Highway to Nowhere", with the median reserved for transit. A rail system plan was completed one year later in 1968, following the "hub and spoke" model used for virtually all modern rail transit systems.

The previous post chronicled the history up to 1999, at which time the present regional rail system was already in place (except for some light rail double tracking).

Now comes the history of the birth, life and death of the Red Line, from 1999 to the present...

In 1999, a new 20-year statewide transit plan was completed with a clear and do-able future financial framework for the west line.

But then only one year later in 2000, that plan was cast aside for a financially unsupported multi-billion dollar pipe-dream that is the current Baltimore Region Rail Plan, which was the birth of the now-defunct Red Line and many miles of even more unattainable and infeasible rail transit.

Now in 2015, we need to look back at 1999 in order to salvage the dead-end planning which has taken place since then that has led to the current stalemate.


1999 Transit Plan

The 1999 plan's recommendation was that overall transit funding should be increased by 40% (it has actually increased far more than that), but funding specifically for "capital expansion" should be decreased by 30% from previous levels, in order to emphasize improving the operation of the existing facilities and services. The study concluded that doing this would nearly double transit ridership by 2020 (only four years and four months to go!)

Three alternative capital projects were defined for the Baltimore area: (1) A west line from Downtown to Security/Woodlawn, (2) A downtown light rail loop which would extend the existing Howard Street-to-Penn Station line around the east side of downtown via the Jones Falls corridor, then back again via Pratt Street, and (3) A Metro extension from Hopkins Hospital toward White Marsh.

Soon thereafter, the MTA and the City concluded that the light rail loop should be built first, since this would best fulfill the downtown distribution and circulation functions for all the rail lines and the system as a whole.

But almost as quickly, they realized such a surface loop would be too slow and circuitous to serve these functions. The Citizens Planning and Housing Association then organized a campaign called "Northeast Now" to make the Metro extension beyond Hopkins the top priority.

But instead, only a year later, the powers-that-be decided to scuttle this three project wish-list with its de-emphasis on capital projects, and go back to the drawing board to create an entirely new comprehensive regional rail system plan. The resultant multi-billion dollar capital plan was a major departure from the 1999 plan.

2002 Plan and the Birth of the Red Line

Thus in 2000-2002, the Red Line was born. After over three decades, it was the first working rail plan to abandon the unified downtown hub concept. Instead it called for the west rail line to continue eastward through downtown in its own right-of-way, rather than being built as a west-only project.

This 2002 plan ambitiously called for the Red Line to be built from its west end eastward through downtown to Fells Point, while simultaneously building two other high priority rail projects: a Metro (Green Line) extension from Hopkins Hospital to Morgan State University, and a "Mini-MARC" (Purple Line) with five new stations providing local service eastward from Broadway (just north of Johns Hopkins Hospital) to Middle River (the existing Martin Airport MARC Station). The initial cost estimate for all three projects combined was $2.5 Billion.

But the latter two projects (other than the Red Line) were later apparently found to be infeasible. The Mini-MARC line was quietly abandoned, perhaps because Amtrak owns the tracks and surely would not want to see their New York-to-Washington service further bogged down by five new station stops in this highly bottlenecked corridor.

The Metro extension to Morgan began the same full-blown federal funding planning process as the Red Line, but its early cost effectiveness scores were so terrible that the study was abruptly cancelled.

With those "high priority" projects cancelled, the rest of the 2002 plan essentially was dead as well. Red Line supporters had to change their mantra from the being part of a complete system to being the single critical project that would save the Baltimore rail transit system.

Thus the Red Line became "all or nothing".


The Red Line Goes It Alone (2003-2015)

The next realization was that Fells Point was not an appropriate east terminal point for the Red Line. This opened a new debate because the original ultimate plan had two termini, one branching southward to the Canton waterfront and the other swinging northward to Bayview, then further southward to Dundalk/Turner's Station.

The initial idea to resolve this was to combine both alignments into a surface loop that would take the south route from Fells Point via Boston Street through Canton, then northward on Conkling Street to Highlandtown, then back to Fells Point. This was rejected.

The final resolution was a big zig-zag. The line would follow the south alignment via Boston Street, then swoop all the way north to Bayview and then south again to Dundalk/Turner's Station. But then, the Bayview to Dundalk leg was left off the "priority project" (probably forever, since it would be so slow and circuitous).

In this early stage leading to the Draft Environmental Impact Statement, there was surprisingly little controversy. Most people were united in wanting maximum tunneling to minimize impacts and traffic conflicts. But gradually, the Canton (east side) and Edmondson Village (west side) communities realized the cost pressures meant they wouldn't get their respective tunnels under Boston Street and Edmondson Avenue.

And the MTA didn't want to play favorites. Even the west-side Cooks Lane tunnel was kept to a single reversible track in the initial "Locally Preferred Alternative" to keep the total project cost well under $2 Billion, which was considered a major price-point threshold.

The LPA plan also included a total revision of the ridership data that had previously been used to compare and reject all the other alternatives. Projected daily ridership was thus suddenly increased from 40,000 to 60,000, making the LPA plan look very much more cost-effective than before. (Since then, various adjustments have been made to bring the number back down to 47,000.)

Transit advocates were uniformly critical of a single track Cooks Lane tunnel, citing the reliability and delay problems suffered by the existing light rail line when it was originally built with large single track segments. Add to that the safety threat of running a reversible track in a tunnel with a sharp blind curve.

The MTA never retracted their contention that a single track tunnel would be just as safe and viable as a two track tunnel, but they abandoned their one-track design anyway while allowing the cost estimate to go over $2 Billion.

However, the MTA stood firm on no tunnels through Canton and Edmondson Village. East-side Cantonites continued to protest, but west-siders largely became resigned to a surface Red Line squeezed onto Edmondson Avenue.

Next, the MTA discovered they needed to extend the downtown tunnel under Fremont Avenue because of engineering problems, to which the community filed a lawsuit.

Then leading developer John Paterakis forced the MTA to move the Harbor East Station away from Central Avenue, the major north-south spine into the huge Harbor Point complex. This required the redesign of the entire tunnel under the Inner Harbor.


You Only Die Once?

As a result of all this and ensuing delays, the Red Line's cost estimate climbed to mere dollars away from $3 Billion, another major psychological price-point. This price tag was certain to rise even more because of further delays (even before Hogan was elected Governor), and the fact that the various project responsibilities and cash flows had never been fully itemized. For example, the hoped-for $900 Million federal funding was programmed in only $100 Million annual increments, which doesn't add up for a six-year project with very heavily front-loaded costs for expensive tunneling.

In addition, the 10% local share pledged mostly from the city government included many costs that were not in the totals. Most uncertain of all, the public-private partnership would have been extremely complex and was fraught with mystery.

All this made it impossible for the MTA to prepare the most important document to make the Red Line a real project - the Full Funding Grant Agreement.

Pete Rahn no doubt learned far more than all this during the brief time he had been Governor Hogan's Transportation Secretary in early 2015. Originally, he said he intended to make a decision on the DC suburban Purple Line prior to studying the Red Line.

But the Red Line apparently looked so bad to him that he didn't see the point in waiting to kill it, and the process which he used to save the Purple Line would clearly not work for the Red Line. The city's cost share was already "smoke and mirrors" and Baltimore County had already balked at contributing real money. The only major cost that could clearly be cut was the two block long pedestrian tunnel to the Metro. The Purple Line's private sector partner would clearly have top responsibility for design, construction and operation, unlike the convoluted web slowly being woven for the Red Line.

When Mr. Rahn cited the Red Line's 3.4 mile downtown tunnel as its "fatal flaw", it made the point that cost problems alone were sufficient to kill the project in the absence of a Plan B, since this tunnel alone comprised approximately half of the total construction cost.


Red Line Autopsy

In 1999, Governor Glendening presided over an incremental plan that created a sound financial basis for transit growth, but then almost immediately the hype-meisters pushed that strategy aside in favor of the indulgent 2002 comprehensive regional rail plan. Since then, the Red Line has been dieing a slow death.

Governor Ehrlich's administration saw problems, but tried to fix them by simply promoting bus rapid transit instead of rail, not by addressing the structure of the system. Then the O'Malley administration doubled and tripled-down on the Red Line, even while overseeing eight more years of chronic delays.

The downtown tunnel was the immediate cause of death, but the 2002 plan was the underlying cause. The Red Line's fatally flawed tunnel existed due to the 2002 decision to build an east-west line separated from the rest of the rail system. The other rail lines in the 2002 plan proved not to be feasible, leaving the Red Line with no Plan B.

Baltimore Mayor Stephanie Rawlings-Blake was particularly confounded by this. She had steadfastly bought into the "once in a generation... all-or-nothing" hype, but then when the Hogan administration killed the project, she vowed that her staff would formulate and negotiate alternatives. This led to a "working session" with the state in August, at which time she and the other Red Line supporters reneged on her offer of alternatives and instead merely volleyed the challenge back into the state's court.

The years of preaching "No Plan B" thus backfired,


The Red Line is Dead - Long Live the Red Line

The Red Line's problems are clearly fixable: As MDOT Secretary Pete Rahn said, the downtown tunnel was the Red Line's fatal flaw. So just get rid of the fatal flaw.

The work of the past 15 years can be salvaged by building a west-only Red Line as it was planned from the 1960s onward to 1999, with additional linkages to the rest of the system that comprise Plans B, C, D and onward until Baltimore has a rail transit system that actually works.

August 31, 2015

Governor Mandel's Rail Transit Legacy

Governor Marvin Mandel, who died yesterday at the age of 95, was in many ways the father of Baltimore's rail transit system.

When he became governor in 1969, Baltimore's transit system was still being run by a private company teetering on bankruptcy. Governor Mandel presided over the state's takeover of the bus system to create the Mass (now Maryland) Transit Administration. The creation of the MTA was highly intertwined with the movement to build a rail system for the Baltimore region.
1968 Baltimore Region Rail Plan - all "heavy rail"

In the previous year, 1968, a full six leg heavy-rail Metro system plan was adopted by the Regional Planning Council (now the Baltimore Metropolitan Council which is the "MPO" for meeting fed regs), with all legs emanating from a central hub at Charles Center. The two top priority projects were declared to be the northwest and south legs.

Many people thought this was a pipe dream, considering not only the expected formidable fiscal and political difficulties, but also the reality that there wasn't even a public entity that was remotely capable of building such a system. There had been idle talk of building a rail system for at least 50 years.

But despite similar controversy and skepticism to what recently killed the Red Line, Governor Mandel actually figured out how to get the system funded and under construction.

Mandel recognized that political support for a south rail line in Anne Arundel County was weak and that the cost of building a multi-line heavy rail transfer station that crisscrossed downtown underneath Charles Center would be extremely high. So he killed the south line and focused solely on building the 14-mile northwest line to Owings Mills, with an 8-mile interim phase to Reisterstown Plaza.

The final agreement to get this project moving was that the second line would be to the north rather than the south. It would also be a far less expensive light rail line along the Jones Falls valley rather than heavy rail through Towson which was an extension of the south line in the previous plan,

Thus Governor Mandel used his pragmatic political skill to get the Metro built, in contrast to the recent strident futility of the MTA and city's Red Line all-or-nothing "No Plan B" 15-year process.

Meanwhile, the eventual corridor of a west rail line was cemented in place by the construction of 1.5 miles of Interstate 70 (US 40) between Franklin and Mulberry Streets, with its median reserved for future transit. After that, however, the west line took a back seat, and all that was ever built is what is now known as the "Highway to Nowhere".

Also in the latter 1970s, the heavy rail west line plan, which would have branched off from the northwest Metro just north of the Lexington Market Station, was replaced with light rail. The concept was to tie the incompatible heavy and light rail lines together through an elevated "downtown people mover" system not unlike what was built to serve the Metro in Miami. The people mover would meet the Metro at Lexington Market. It would then travel eastward and meet the north light rail line at the south end of the Jones Falls valley, at Guilford Avenue and East Saratoga Street.

In the 1980s, the people mover plan died a slow death. The north light rail line plan was moved from the Jones Falls westward to Howard Street through downtown and linked to a south light rail line. Both were quickly built under the impetus of the 1992 opening of Oriole Park at Camden Yards. The Metro was then extended slightly eastward to Hopkins Hospital.

The plan throughout the '90s was to link the eventual west line to the north-south light rail lines at Howard Street.

All of this was the ultimate result of Governor Mandel's 1970s push to get the northwest heavy rail Metro built, cancelling the south Metro line and then shifting the focus to light rail.

The main constant has been that every regional rail transit plan formulated for over the past half century since the 1960s has had a west line in the US 40 Franklin-Mulberry corridor, which remains in limbo with the recent cancellation of the Red Line.

Story to be continued...

August 24, 2015

Casino Entertainment District

Horseshoe Hotel on the Middle Branch as envisioned by Peter Tocco

 UPDATE: Erin Chamberlin, senior vice-president and general manager of Horseshoe Casino Baltimore now says of the hotel: "We certainly envision a time when such a project could serve as a prominent component of the area's broader redevelopment." (The Sun, October 27. 2016)

This comment is skillfully phrased to position the Horseshoe within the city's development climate and its casino competition at Arundel Mills and National Harbor, both of which are nearing completion of their own hotels.

The Horseshoe is willing to wait to see how they're impacted. It's a win-win for them. The worse the Horseshoe is hit by the competition, the bigger the subsidy they'll get from the kickback of community impact fees. And yet the casino was supposed to be a cash cow.

Considering that the casino area's biggest "broader redevelopment" so far has been renovated convenience stores like Royal Farms and the "Greyhound Bus Station From Nowhere", the Horseshoe will be sitting pretty to demand major city support for its hotel.

The Horseshoe Hotel plan is inevitable.

Waterfront hotel on a Middle Branch Parkway


Casinos are all about fantasy and illusion. As such, the recently released 184 page master plan for the Horseshoe Casino communities is all about spreading casino winnings to its surrounding areas, very much the same way gamblers fantasize about what they're going to do when they get that big win.

Similarly, the proposed Horseshoe Casino Hotel shown above is just a fantasy illusion, skillfully photo-shopped onto a picture of the Middle Branch by Peter Tocco. This hotel's illusion is based on being just a thin veneer which would wrap-around and hide the monster parking garage that the casino built on its waterfront. Such veneers have become popular and fashionable in postmodern architecture, including in Baltimore.

But right now, the giant parking garage is what drivers on Interstate 95 see as the casino's lure. That's not much of a fantasy. What they ought to see is a glamorous hotel conveying the message of opulence and possible riches, or at least being "comped" for a free night.

The rear of the 3400 car casino parking garage as it encroaches on the Middle Branch waterfront seen from underneath I-95. It's a huge footprint, but it looks far more dominating as seen from I-95 above. M&T Bank stadium is shown to the right (north).

The "Gateway Master Plan"

There's not much basis in the master plan report for this fantasy. Mostly, it's just a "plan to do a plan" - trying to get "buy-in" from the local stakeholders for whatever happens. Maybe we'll win, maybe we won't. At this point, the casino's future success is dubious at best due to killer competition from Arundel Mills and National Harbor.

The report hardly even mentions the casino, the impetus for all this, any more than it has to. The physical plan recommendations begin on page 130 (pdf page 138) through page 143.

Here is the entirety of the report's recommendations directly pertaining to the casino area:

"A new entertainment district along Warner Street would connect the Horseshoe Casino and M&T Bank Stadium and offer restaurants, shopping, hotels and other entertainment choices. The City should establish specific land use recommendations, restrictions and urban design guidelines for the Warner Street area, including options for improving pedestrian safety at the CSX Railroad crossing. The design study should also explore land use changes and public improvements for Russell Street."

"RECOMMENDATIONS 1 Conduct a land use and urban design study to establish the vision for a new entertainment district along Warner Street and portions of Russell Street. The study should consider how best to enhance and take advantage of nearby access to the Middle Branch waterfront."

Very well and good. It would have been nice if the city had taken this idea seriously before the casino was built, when the casino's giant parking garage was allowed to dominate and displace Warner Street and the waterfront. This severely reduces the flexibility in how to balance urban and natural needs. The waterfront was an afterthought, hidden away and therefore vulnerable to any kind of abuse. 

It's also essentially too late to "explore land use changes and public improvements for Russell Street." The street recently underwent a major rehab and its downscale gas stations and convenience stores are now being replaced by higher-class gas stations and convenience stores. So much for a "gateway".

So the real key to creating greater connectivity to the city's surrounding urban fabric must now be to shun the gasoline-alley pseudo-suburbia of Russell Street and create a new far more urban and human-oriented gateway along the waterfront. There's no other choice.

Middle Branch Parkway

This can be achieved by creating a new two-mile Middle Branch Parkway which extends all the way from Conway Street at the cusp of Camden Yards, the convention center and Downtown, southward to Westport and Waterview Avenue. Its goal is to create the most flexible possible public realm, optimized to balance development and nature.


Proposed Middle Branch Parkway extending from Westport (left) northward to Camden Yards and downtown (right). This would be the casino's new waterfront address.

The parkway should be built to accommodate slow moving auto access, but it should also be closable for any kind of event - sports events, cycling events, drinking events (pushed out of Federal Hill), gambling events, festivals or even just weekend solitude.

In the Camden Yards area to the north, the Middle Branch Parkway should create urban street frontages for the Oriole Park Warehouse and the MARC Station, air rights development sites over I-395 and the railroad tracks, new development sites carved out of the expansive surface parking lots and better edge definition for the remaining parking lots.

South of Stockholm Street nearer the casino, development opportunities are more limited. The emphasis should be placed on creating an urban edge for the waterfront area to promote surveillance, maintenance and a constituency to prevent "out of sight, out of mind" neglect and abuse.

To do this, the development footprints for the parking lot and adjacent animal shelter sites along the water should be relatively small to leave more room there for parkland and nature. These two parcels are arguably the most important in the entire Middle Branch, because they are the closest to the South Baltimore and Pigtown neighborhoods, accessible via the Ostend Street underpass which avoids conflict with Russell Street, and from Sharp Street which avoids conflict with the CSX mainline railroad crossing on Warner. Sharp Street is also particularly close to the huge new Caves Valley development.

There's plenty of room left over for nature, a waterfront parkway and a hotel attached to the veneer of the Horseshoe Casino parking garage, The downtown skyline in the distance (right) can be made to look like Oz's Emerald City instead of the gasoline-alley gateway on Russell Street. (Maybe the parkway can even be built as a Yellow Brick Road.)

This would be compensated, however, by the casino hotel site on the long narrow veneer of the parking garage. The city obviously does not think development near the casino has much potential anyway, as evidenced by their leaving the Greyhound Bus terminal on the site just to the south. Eventually, this should also be replaced by something more appropriate and Greyhound should get a much more suitable and less isolated site.

South of the casino, the parkway would extend underneath the I-95/I-395 interchange, a vast surrealistic underworld that seems fascinating (to me anyway) in a postmodern juxtaposed kind of way. The hidden isolated nature of this area means that it is currently severely trashed, but it has tremendous creative potential. 

South of I-95, Westport starts, and the billion-plus dollar development site recently purchased by Under Armour's Kevin Plank, which would be the strong southern anchor for the parkway. The north end of Westport in the shadow of I-95 is slated for parkland, but as currently configured, it would be difficult to maintain a pristine park to the south while ignoring the adjacent I-95 catacombs. The parkway would unify them in a much more coherent and sustainable manner.

The success of the long delayed Westport development would also benefit great from the parkway, creating the direct linkage that would make Westport a downtown community instead of an isolated island. 

A new North Westport light rail station station could also be built to provide decent access to the casino, bus station, and a future spur to the rest of the Under Armour empire at Port Covington (see blog article).

The need for a casino hotel

The need for a casino hotel is far stronger now than when the casino was in its planning stages. The original statewide enabling legislation called for high tax "slots barns" which would focus simply on local patrons who did not want to travel to more lucrative out of state gambling venues.

The stakes were greatly increased when the state added table games, slashed the tax rate and approved an additional world-class casino at National Harbor near Washington, DC. Concurrently, the Arundel Mills casino just  few miles down the Baltimore-Washington Parkway started dominating the high stakes competition with Baltimore's Horseshoe. They have recently announced that they will build a hotel attached to their casino.

Baltimore must find its comparative advantage in this competition. It can only be in emphasizing its urbanity over its Russell Street frontage amid the gas station/convenience stores.


Peter Tocco's more "over the top" alternative design for a veneer hotel attached to the casino's waterfront parking garage.

The hotel itself would be just a means to an end - the image it conveys. The casino marketers and city image-makers need to decide how to best present the casino to its market. It may be a tasteful facade or it may be Vegas-style, over-the-top. That must be negotiated. There are already examples of how our once clean, sleek Inner Harbor has been made over by the image-makers, with a giant guitar attached to a smoke stack and a cartoon monster wrapped around a Harborplace entrance. 

Baltimore is past the point of no return on gambling. The casino must be re-oriented to the waterfront and the waterfront must be reoriented to downtown. It's all about reinforcing the casino's image as a place of fantasy and illusion. The casino parking garage must be given a new active waterfront facade with an address on a parkway which integrates the Middle Branch with downtown.

August 17, 2015

Lexington Market Metro Transit Hub

Re-centering the rail transit system
Lexington Market Metro Station - A short passageway to the Howard Street light rail line can be built
into this wall behind the turnstiles on the mezzanine to the Hutzler's Clay Street portico (see photo below). 

Baltimore's east and west sides have gotten severely out of balance. An urban realignment is needed to enable real connectivity in the transit system and thus maximize economic opportunity

Baltimore's has a hub and spoke transit system based on its geography, but the central hub is weak or non-existent.

The first step in creating workable connected rail transit is thus to give the system a real central hub. And the only practical place to do this is at the Lexington Market Metro Station.

Since the 1960s, this kind of connectivity has always been an essential element of every rail transit plan, but the city has failed to do its job to enable this to happen. Over the past 20 to 40 years, the city has allowed downtown to move steadily eastward, leaving the Howard/Lexington area as a largely boarded-up shell of its former self.

Then in planning for the defunct Red Line, the MTA responded by proposing its downtown transit hub to be built around an isolated two-block long pedestrian tunnel between the defunct Red Line and Metro at Charles Center. That was half-hearted at best. While the Red Line's abandoned 65% completed engineering drawings of the tunnel and stations showed great detail, they still showed only sketchy outlines of how that pedestrian tunnel might actually be built. It seemed inevitable that this severable tunnel would remain unbuilt even if the rest of their Red Line plan had somehow gone forward.

The MTA couldn't even do its job at what is rapidly becoming the new downtown at Harbor East and Harbor Point. Lead developer John Paterakis rejected the MTA plan and forced them to move the Harbor East station to a much more isolated spot between Harbor East and Little Italy.

The city has also failed in that the new east-leaning downtown is far more auto-oriented than the old downtown. The city's tallest building, the USF&G come Legg Mason come Transamerica come COPT Tower, had to build a new parking garage to become marketable. The city's newest growth centers are off on peninsulas (Harbor Point and Port Covington) and marching into what was the industrial waterfront along Clinton Street 5 to 8 blocks away from the Canton Crossing Red Line station site, which is across the street from a new suburban-style shopping center.

The traditional downtown role is probably now gone forever, but a central transit hub is still needed as much as ever, as an organizing element and for transfers. Baltimore still has a huge captive transit ridership base and there is also a growing market of people looking for a "transit lifestyle".

The Lexington Market area is still popular among this transit captive group, but they have insufficient income to trigger investment. The hyped-up "downtown as a neighborhood" trend is filling the void created by the loss of downtown as the center of the region, but so far this has happened in all other directions much more than on the west side, near Lexington Market or beyond. As a result, transit's image is of a downscale market, and the Red Line's attempt to change this has been hollow. Even if somehow built, once the Red Line's "new car smell" had worn off, it would have been just another captive transit mode.

The city's greatest challenge is not to just build an ill-conceived transit line by chasing regional development trends going in the opposite direction in an attempt to be "transformative" (catchphrase du jour, replacing "game changer"). It's to make the most of what we already have, and build upon that.

Lexington Market Metro Transit Hub

Downtown rail system - Existing Metro Subway Green Line and Surface Light Rail Blue Line,
and a proposed west-only Red Line. 

Geographically, it is readily apparent that Lexington Market should be the place for the city's central transit hub, where the Metro (green line) and central light rail (blue line) come closest, and where the Red Line can most easily meet them.

The Metro is far-and-away the best, fastest and highest capacity transit mode that Baltimore is likely to have in the conceivable future and therefore must serve as the trunk.

Even in the MTA's defunct disjointed Red Line plan, 22% of riders on the entire line were projected to be transfers to or from the Metro, while 10% would be to-or-from the existing central light rail, for a total of almost one-third between the rail lines. This should be augmented by a significant volume of bus transfers.

The Hutzler's Clay Street portico (left background) is an ideal place to connect the existing Metro and Light Rail lines.
Hutzler's was once the city's premiere department store, but now sits vacant along with much of Howard Street.
Here's what can be done in the near term to make the Lexington Market Metro station into the system's true central transit hub:

1- Link Light Rail and Metro - Build a short pedestrian connection between the existing light rail and Metro stations, using the Hutzler's Clay Street portico shown in the photo above. The ground slopes to promote this. When the Metro was built in the 1980s, a pedestrian plaza was provided there as part of Hutzler's Department Store's last-gasp renovation before it was closed up for good. This can be reopened and extended down into the Metro mezzanine itself (beyond the turnstiles in the top photo), rather than into the shuttered department store.

In the diagram below, this connection is the narrow dark red link from the big blue box (the Howard light rail station) at the far right to the big green box (Metro station under Eutaw Street). 

Possible Lexington Market Transit Hub - Existing Metro subway station in green.
Existing light rail (right) and MTA parking lot (top) in blue. Existing Metro entrances in pink.
Proposed Red Line station and portal and pedestrian passageway in red.

2- Create a Bus Hub - A convenient place for bus transfers can be created using the MTA's parking lot (blue box at the top of the diagram above) just north of their operations building which hovers over the Metro entrance in the northeast corner of Eutaw and Saratoga Streets (pink box in the diagram above). This building is also shown in the photo below, with the parking lot on the other side of the fence in the left foreground.

This bus hub is needed not just for transfers but also as a staging area for various bus lines terminating downtown. The parking lot is now used by MTA employees who prefer to drive rather than use their free transit passes.

MTA Metro Operations Building looking southward on Eutaw toward Saratoga. The Metro entrance is on its ground level
and the parking lot beyond the fence in the left foreground can be converted into a bus transfer hub.

3 - Make room for a west leg of the Red Line - This is shown along or under Saratoga Street on the left sides of both diagrams above. It can be on the street's surface, tieing into and sharing the Howard Street light rail station shown above, or it can be in a "cut and cover" alignment under Saratoga tieing into the Metro mezzanine.

In the "cut and cover" option, the tunnel portal would be two blocks to the west, just beyond Greene Street where Saratoga widens and has a big downward slope, ideal for a light rail line going underground. In the existing Metro mezzanine, the Red Line terminal station would be just beyond where the wall is in the photo below, just to the right of the Metro turnstiles. (The Red Line has been designed to operate without turnstiles.)

In either of these "Plan B" Red Line options, the MTA has already done most of the planning and much of the engineering. The only new planning would be for this 4 to 5 block portion on Saratoga Street between MLK Boulevard and the Metro Station.

The essential requirement is eliminating the defunct Red Line's "fatally flawed" 3.4 mile tunnel through downtown, which totally bypasses the Metro, exacerbates the lack of a central hub for the rail transit system and further reinforces the city's severe east-west development imbalance. It was that tunnel that led to the downfall of the MTA Red Line project after 15 years of planning.

Lexington Market Metro mezzanine under Saratoga Street.
The Red Line platforms could be located just beyond this wall to the right of the turnstiles.

August 10, 2015

The "Plank Line" from Westport to Port Covington


Make room for opportunistic rail transit

The MTA Red Line died because its waterfront tunnel was way too expensive, yet that's just the part proponents pointed to for major new development. But it's far easier to build a different line using existing rail right of way and vacant land with far more new development opportunities.

After the 15 year Red Line ordeal, perhaps Baltimore's next rail transit line should be short, quick, relatively inexpensive and truly in sync with future development. But only if the timing is right.

The recent announcement that Baltimore's billionaire Kevin Plank has bought the Westport waterfront underscores a major lesson: Development is all about timing. Great developers have it, while the rest of us - planners, bureaucrats, spin-meisters and other mere mortals - don't.

Less successful developers certainly don't have it. Patrick Turner assembled the Westport properties a decade ago at great cost and fanfare which ended with his recent foreclosure, whereby Under Armour magnate Plank picked them up at the fire-sale price of just $6 million, after also buying development rights to Port Covington across the water from various landholders.

Western Maryland railroad right-of-way in Port Covington looking toward
 Westport in 2007. It still looks about the same except Patrick Turner
had the Westport building in the background demolished.

Big businesses don't necessarily have it. Wal-Mart and The Sun bought into Port Covington early-on, even though their ugly sprawled-out buildings were totally out of keeping with the urban hype and vision.

Most of the city's vacant buildings and lots are monuments to bad timing, fueled by bad planning. Worst of all are bad mega-deals where some kind of arbitrary long-range development and payback timing is preordained, then kicked down the road whence the lawyers end up sorting it out. More and more deals are ending up that way.

The MTA and the City don't have it. They built the central light rail line and formulated the Middle Branch vision for Westport and Port Covington back in the 1980s and 1990s and have been waiting for riders and development ever since.

The recently failed $3-billion-plus MTA Red Line transit plan was predicated upon filling its billion-plus dollar funding gap with a convoluted 30-40 year "public-private partnership" that promised to be a disaster in the making.

Learning Our Lessons

At least when the Central Light Rail line was built in the early '90s, the inevitable cost overruns were resolved by cheapening up the plan rather than mortgaging or foregoing our future. That caused some further temporary pain as the second track was built later, and much of it is still in disarray, but it's fixable. Even simple matters like better traffic signal timing and decent pedestrian connections would help immensely.

The worst part is the region's chronic failure with "transit oriented development", which has left Westport, Howard Street and State Center to crumble in the clutches of speculators.

The Red Line would have attempted to resolve this problem in the worst possible way. Half its huge cost was to be devoted to a 3.4 mile tunnel to allow it to serve areas which are already being developed anyway in concert with automobile dependency. That's the worst of both worlds, as evidenced by John Paterakis forcing the Harbor East station to be tucked away rather than being oriented to serve the prime Central Avenue growth corridor from Harbor Point to Old Town.

The way out of this institutionalized mess is to develop plans which are not dependent upon timing. The city should instead focus on how to build the basic infrastructure necessary to allow the best projects to rise to the top, without convoluted long-term subsidies that undercut competition and transparency.

Fortunately, the best designed transit line the city can ever hope to have is already in place - the 16-mile Metro. And the best designed portion of the Central Light Rail Line is the two-miles between downtown, Camden Yards and Westport. The rest of its south leg to Cherry Hill and BWI-Marshall Airport is pretty good too. All of this is something to build upon.

The Plank Line

The immensity of Kevin Plank's new Under Armour Empire between Westport and Port Covington has big pitfalls, but also creates big opportunities. One of the biggest is the possibility of building an inexpensive 1.5 mile light rail spur between them which would enable "transit oriented development" on a scale that the Red Line could only dream of.

Coupled with the best two- miles of the existing light rail line, this would create a strong, seamless connection to Camden Yards, the Convention Center, the Pratt Street Inner Harbor corridor, and the portion of downtown which most desperately needs to be revitalized. It would also create an easy path for local tycoons to get to the airport to visit the rest of the Under Armour World Empire, while mingling with their customers from Cherry Hill to Linthicum.

Unused West Maryland Railroad bridge over Middle Branch, as shown in 2007 City Planning Commission report.

The signature element of the Plank Line would be the old Western Maryland Trestle Bridge which is already on the drawing boards for revitalization as part of the Middle Branch bike/hike path system. This portion of the Plank Line would probably need only one track, leaving plenty of room to accommodate the adjacent joggers and bikers actively modeling their Under Armour-ware.

The former Western Maryland rail right-of-way continues under Hanover Street and into Port Covington, which used to be its great port terminal freight yard. At the Sun plant, the Plank Line can turn southward down to the Wal-Mart and its adjacent abandoned Sam's Club, which Under Armour is now adapting for waterfront office space. Charles Street can also be extended southward through the McComas/CSX spaghetti to provide an umbilical cord between the Plank Line, Port Covington and the existing South Baltimore neighborhoods. Even congested Hanover Street can be upgraded as its spiffy new median strip at the south end of the existing neighborhood demonstrates.

All of this should be planned now, but should not be built until and unless development is ready for it.

Defunct Wal-Mart Sam's Club is now being rebuilt and reoriented to the water for Under Armour (Kevin's Club?)

The Near Term

A new North Westport station along the existing central light rail line could be built sooner if opportunities warrant. While ultimately it would anchor the Westport end of the Under Armour empire and enable transfers to catch the light rail to the airport, it could also be the closest "terra firma" for a light rail station to serve the Horseshoe Casino via an extension of the Middle Branch Greenway. This could provide the great urban waterfront front-door image that the casino needs to displace its gasoline-alley persona across from all the gas station/convenience stores on Russell Street.

Strong measures are also needed right now to start arresting the eastward drift of the downtown, which has been integral to the failure of Westport, Howard Street, and the entire light rail ridershed. The central light rail line needs to be worth connecting to.

The clearest way to do this is to integrate the light rail and Metro stations at Lexington Market into a strong central transit hub, something all successful modern rail transit systems have. This could include a direct pedestrian connection through the Hutzler's Clay Street portico, a bus hub on the MTA parking lot north of Saratoga, and a link to a west-only Red Line.

The recent extension of the Under Armour Empire westward to Westport could thus help guide the direction of the entire city. A 1.5 mile "Plank Line" could be instrumental in reinforcing this, but only if and when the timing is right.

August 6, 2015

Highway cavern can forge a new city transit culture

What Baltimore needs as desperately as better transit is a genuinely viable transit culture - where transit is a welcome and central part of the lifestyle, not just a necessary imposition. Unfortunately, transit in Baltimore is mostly the latter, and mostly limited to low income "captive riders" given greater scrutiny due to the recent West Baltimore "unrest".
The Harlem Park Red Line Station could look like this...



But West Baltimore's "Highway to Nowhere" is just sufficiently far to the fringe to pull off such a cultural transformation. Even if the Red Line is only reserved a future place of honor rather than built tomorrow, it can be done. The important thing is to simply create a good encompassing plan to replace the anachronistic highway and the massive abandoned Metro West Social Security complex.

We already know the highway isn't needed. It's been closed sporadically for the past several years with no significant ill-effects, even while its next major alternate route on Frederick Avenue was also closed for bridge rehab. If it ever was possible, it's now too late to create a plan based on weaving the highway corridor back into the surrounding neighborhoods - there's not enough of them left to do it.

Marc Szarkowski's rendering above, based on the MTA's rendering of the Harlem Park Red Line Station below, creates a world apart that could also create a world together. Development would have two street levels, one down in the new transit "ditch", and the other up at the level of Franklin and Mulberry Streets and their overpasses. The highway's retaining walls could either be demolished or retained to "wrap" around the new development. There would be a street for cars on one side of the transit line and a conflict-free street for people on the other side.
...but this was the MTA Plan for the Harlem Park Red Line Station inside the "Highway to Nowhere".


This kind of transformation is what is needed to create true "transit-oriented development" - a thus a true transit-oriented culture. Seeing literally becomes believing.

Light rail on Howard Street tried to do something like this, shoving off the street traffic in the 1980s. To be exact, Howard Street had already been converted to a vacuous bus mall before light rail came along, while already losing the battle for both the downtown retail and office markets.

The MTA's recently defunct $3 Billion Red Line plan was also a weak gesture toward a transit culture, but virtually everywhere it would have been fighting a losing battle for attention with traffic or burrowed out of the way deep in the ground.

The Red Line planners tried to pretend that the "Ice House" (left) north of the east end of the highway corridor was the pivotal site for transit oriented development, but that's just where through traffic is most concentrated to get through the Amtrak underpass. There was no chance for a true "orientation". Plus, the nearby MARC commuter rail station is now planned to ultimately move farther away to avoid the big curve in the tracks. And if MARC was somehow a great opportunity for new development, the Penn Station area would have taken off decades ago, instead of waiting for arts and education to become the true catalysts.

The best opportunities for urban integration are all at the opposite end of the highway corridor nearer downtown - not only the necessary and crucial redevelopment of the massive Metro West site, but also the University of Maryland campus, the gorgeous but isolated Heritage Crossing neighborhood, and transforming MLK Boulevard into a people place.

The state's recognition that the Red Line's downtown tunnel was fatally flawed also means the Red Line's goals must be changed, even if its west side alignment is kept all or mostly intact. The Red Line in any form will NOT transform the transit system. It was way too slow, low capacity and disconnected to do that. Only the bus system, the Metro, and their interrelationship can be the main elements of any MTA transformation.

Most basically, a far less expensive west-only Red Line should be designed for shorter trips. An effective transit-oriented development plan would augment this, encouraging more casual hop-on, hop-off trips that are actually part of a lifestyle. Just hop on and off to go to the MARC station, Lexington Market, a college class or wherever.

There could be up to three additional stations in the short new segment between the west Red Line and downtown, all encouraging shorter trips, such as:

  • At the Lexington Market Metro Station - Saratoga near Eutaw and Howard,
  • At the University of Maryland and Metro West - Saratoga near MLK Blvd or Pine Street.
  • At Heritage Crossing - at a newly reconnected Fremont Avenue.
Heritage Crossing with the empty Metro West Tower in the background, separated by two hidden but heavy highways, MLK Boulevard and the "Highway to Nowhere".

The redevelopment in these three areas must be planned at the same time as the "Highway to Nowhere" redevelopment. Strong possibilities for this would include a north expansion of the university campus along Pine Street into the Metro West site, a strengthened greenway path along the west side of MLK Boulevard (including compressing the roadway) and an expansion of Heritage Crossing to the south and west.
The dreary, dominant, depressive "Highway to Nowhere"

Urban designers will no doubt think of some great design details. How about replacing one block of the big "Highway to Nowhere" retaining wall with an amphitheater that steps down into the ditch?

This could all be part of a new culture. Most new Baltimore development has used the harbor as the organizing element for its cultural identity. Transit is a much more proactive way of doing the same thing.